Wednesday, February 27, 2019

Revisited

So more than 5 years has past and we have touched and re-touched every surface of this condo. The last piece of the puzzle will be finishing the courtyard this spring.

I wanted to put out an update so that if we ever had a fire or flood or other catastrophe, I would have documentation for the insurance company.


Office (3rd upstairs bedroom)



Guest Room (upstairs)


Large soaking tub - Main Bath Upstairs


Main bath


Added Master Walk in Closet


Whitewater Shower w / bench


Master Bath w/ new fixtures

outside walk in. New baseboards, casings and interior doors and hardware throughout


added recessed lighting
                                      

                                     

new door to balcony
stairwell light fixture




Refinished Hardwood floors and recessed lighting

New Storm and Front door
New Front door and Transom window
New interior doors throughout and new sidelight







New Pantry. Fridge sits in former pantry. All new appliances. (2017)
New, custom shaker cabinets. 

Double oven and microwave

Farmhouse sink and sprayer faucet. Also 3 frame, casement window

                                              


New hardwood in kitchen and dining to match existing in remainder of main floor

3 panel french doors w/ built in blinds







New tile and wall where closet was removed



48" window w/ legal egress added Nov 2018

Basement guest room

new interior doors

Basement bathroom w/ walk in shower


basement family room


new basement carpet, recessed lights, tile


                                    
                                  Basement shop and workbench


  2 water heaters and new water softener